Tag Archive: October 2020 Print Issue

pipe services Guam
2020 Trenchless Technology Project of the Year Winners

Since 1993, Trenchless Technology has recognized the best and most challenging projects in the trenchless industry &mdas...

CIPP training
Lateral Learning

Encountering ‘Hurdles’ in The Field and ‘Why:’ The Pillars of CIPP Training Jim Holcomb, owner o...

Illinois lateral inspection
Inspecting Laterals as Part of ‘Investing in Illinois’ Initiative

Ready? Set. Go! The race is on…at least that’s what it feels like for the lateral inspection crews working ...

Mud Technology International mud system
How’s the Mud System Market in 2020?

Mud recycling systems were once thought of as an integral component just for large diameter horizontal directional drill...

SR 37 Offsite Drainage Outfall Storm Sewer - North Segment
2020 Project of the Year New Installation Honorable Mention: SR...

The $21.6 million project, owned by the Indiana DOT, is part of the SR 37 Improvement Project, Phase 1 in Fishers, India...

SAWS Multiple Sewershed Package 2A
2020 Project of the Year Rehabilitation Honorable Mention: SAWS Multiple...

In many large metroplexes throughout the United States, major sewer trunk lines are located in the large drainage basins...

Port-PL6 Stormwater Storage Tank Tunnel
2020 Project of the Year New Installation Honorable Mention: Port-PL6...

The Port-PL6 Stormwater Storage Tank Tunnel project involved the installation of a 70-in. OD steel case pipe advanced th...

water line rehab with a high-pressure requirement
2020 Project of the Year Rehabilitation Honorable Mention: Rehabilitating 1,890...

Much of Kansas City, Kansas has its potable water infrastructure maintained by Water One, a quasi-municipal water utilit...

Bakken Missouri River Crossing
2020 Project of the Year New Installation: Bakken Missouri River...

Horizontal directional drilling (HDD) projects have been pushing the envelope for size and scope for many years. Each pr...

World Record 42-in. Cast Iron Gas Main CIPL Rehabilitation
2020 Project of the Year Rehabilitation Runner Up: World Record...

A world record was established for the cured-in-place lining (CIPL) of a 573 lf, 42-in., high-pressure cast-iron (CI) ga...

Guam Northern Interceptor Sewer Rehabilitation
2020 Project of the Year Rehabilitation: Guam Northern Interceptor Sewer...

The Island of Guam provided a tropical and scenic backdrop to an impressive and challenging ultraviolet cured-in-place p...

Sur de Texas-Tuxpan Pipeline
2020 Project of the Year New Installation Runner Up: Sur...

The Sur de Texas-Tuxpan gas pipeline is an offshore natural gas pipeline between Brownsville, Texas, and Veracruz, Mexic...

mult-sensor condition inspection tool
Assessing Concrete Pipe to Safely Open a Renovated Fieldhouse

In January 2020, Worthington, Minnesota, was in the midst of renovating an old Campbell Soup cold storage building into ...

city connected
HDD and Fiber Installations in the COVID Era

Work from home. Remote learning. Video conferencing with family, friends and even health professionals. Online entertain...