HammerHead® Trenchless has released its newly redesigned Bluelight LED cured-in-place pipe (CIPP) lining system. The next-generation Bluelight system features user-friendly enhancements and expanded capabilities making it an ideal solution for the rehabilitation of laterals and small sewer pipes 3 to 10 inches in diameter. The innovative Bluelight technology is the most advanced light-curing system available, empowering CIPP lining professionals by alleviating the time pressures of other CIPP systems and curing methods. The specially formulated single-part resin only cures under light in the “blue” wavelength, giving installers significantly longer working time between liner wet-out and curing. Once installed, the automated curing system pulls the LED light head through the liner, curing the resin almost instantly. “The original Bluelight system was, and still is, a game-changer in lateral rehab,” said Josh Hood, Sr. product manager at HammerHead Trenchless. “But our new design incorporates feedback from installers around the world to make it even more user-friendly and efficient to maximize productivity on every lining job.”
New features include:
- Intuitive touch screen interface
- Interchangeable reels available in 131- and 164-foot lengths
- Three light head sizes including a new 3” light head
- Lightweight, ergonomic frame for easier maneuverability and portability
Both the original Bluelight system and the newly redesigned model are capable of navigating and repairing 45- and 90-degree bends, and some transitions. The Bluelight system resin is free of styrenes and VOC’s, and the system meets or exceeds ASTM F1216.
###
Contact Info:
Company: HammerHead Trenchless
Location: Lake Mills, Wisconsin
Toll-Free Number: 800-331-6653
Website: hammerheadtrenchless.com